System.ServiceModel.ServiceActivationException: The requested service, 'https://vdk-sp-app123:32844/f612d5d24a314f3c8fedd0d01190e303/SearchService.svc' could not be activated. See the server's diagnostic trace logs for more information. Server stack trace: at System.ServiceModel.Channels.HttpChannelUtilities.ValidateRequestReplyResponse(HttpWebRequest request, HttpWebResponse response, HttpChannelFactory factory, WebException responseException, ChannelBinding channelBinding) at System.ServiceModel.Channels.HttpChannelFactory.HttpRequestChannel.HttpChannelRequest.WaitForReply(TimeSpan timeout) at System.ServiceModel.Channels.RequestChannel.Request(Message message, TimeSpan timeout) at System.ServiceModel.Channels.SecurityChannelFactory`1.SecurityRequestChannel.Request(Message message, TimeSpan timeout) at System.ServiceModel.Dispatcher.RequestChannelBinder.Request(Message message, TimeSpan timeout) at System.ServiceModel.Channels.ServiceChannel.Call(String action, Boolean oneway, ProxyOperationRuntime operation, Object[] ins, Object[] outs, TimeSpan timeout) at System.ServiceModel.Channels.ServiceChannelProxy.InvokeService(IMethodCallMessage methodCall, ProxyOperationRuntime operation) at System.ServiceModel.Channels.ServiceChannelProxy.Invoke(IMessage message) Exception rethrown at [0]: at System.Runtime.Remoting.Proxies.RealProxy.HandleReturnMessage(IMessage reqMsg, IMessage retMsg) at System.Runtime.Remoting.Proxies.RealProxy.PrivateInvoke(MessageData& msgData, Int32 type) at Microsoft.Office.Server.Search.Administration.ISearchSiteAdministrationServiceApplication.GetScopesInfo() at Microsoft.Office.Server.Search.Administration.SearchServiceApplicationProxy.b__54(ISearchServiceApplication serviceApplication) at Microsoft.Office.Server.Search.Administration.SearchServiceApplicationProxy.DoSpLoadBalancedUriWsOp[T](WebServiceBackedOperation`1 webServiceCall, Int32 timeoutInMilliseconds, Int32 wcfTimeoutInMilliseconds, String operationName) at Microsoft.Office.Server.Search.Administration.SearchServiceApplicationProxy.DoWebServiceBackedOperation[T](String operationName, Int32 timeoutInMilliseconds, Int32 wcfTimeoutInMilliseconds, WebServiceBackedOperation`1 webServiceCall) at Microsoft.Office.Server.Search.Administration.SearchServiceApplicationProxy.DoWebServiceBackedOperation[T](String operationName, WebServiceBackedOperation`1 webServiceCall) at SurfRay.Ontolica.SharePoint.Search.WebControls.SearchBoxWebControl.GetSharePointTarget(SearchScope scope) at SurfRay.Ontolica.SharePoint.Search.WebControls.SearchBoxWebControl.WriteSearchScopes(XmlWriter writer, SearchScopeList scopes, String& selectedScope) at SurfRay.Ontolica.SharePoint.Search.WebControls.SearchBoxWebControl.DoRenderContents(XmlWriter writer) at SurfRay.Ontolica.SharePoint.Search.WebControls.SearchBoxWebControl.RenderContents(XmlWriter writer)

About the project

The motorway section between Funder and Låsby is an approx. 29 km long sub-section of the motorway between Aarhus and Herning.
 
On 28 April 2009, the Danish Parliament adopted a construction act for the project, which had a total investment budget of BDKK 6.2. 

The section between Hårup and Låsby was opened for traffic on 1 December 2014. The section between Funder and Hårup was opened for traffic 11 September 2016.

Why this construction?
The motorway between Funder and Låsby improves both accessibility, road safety as well as the environment in relation to the current national road.
 
In addition to completing the motorway to Herning, the section close to Silkeborg is creating a better and faster traffic flow in and around Silkeborg. For the road users, the motorway save them an average of 12 minutes between Funder and Låsby. Furthermore, traffic are significantly reduced on almost all roads in the town of Silkeborg - as well as on many roads in the entire area between Funder and Låsby. When the very busy roads are relieved, the safety level increases for all road users. 
 
What is the scope of this construction?
The motorway is now connected to the existing motorways at Funder and Låsby, respectively.

The overall project has involved the construction of 29 kilometers of a 4-lane motorway, 7 interchanges, 1 service area and 31 overpasses and underpasses of intersecting roads and paths.​​​​

Oprettet
29-10-2012.
Senest opdateret
18-05-2017.
Ophavsretten tilhører Vejdirektoratet.

Vejdirektoratet
Carsten Niebuhrs Gade 43, 5. sal
1577 København V

Tlf
7244 3333
Mail
vd@vd.dk
EAN-nr.
5798000893450
CVR
60729018
Robot Site Index